Image Preview
1 / 1
Power Apps Development

Custom business applications built around your workflows

We design and build bespoke Power Apps — from lightweight mobile tools for field operatives to complex model-driven systems managing assets, work orders and compliance across multiple sites.
92% Average user adoption rate
68% Reduction in admin time
6 wks Average time to go live
100% Built within Microsoft 365 Tennant
What We Build

Custom Power Apps for operational businesses

We build bespoke Canvas and Model-Driven Apps designed around how your people actually work — not how software thinks they should.

📱

Canvas Apps — Field & Mobile

Offline-capable mobile applications for field engineers, site managers and operatives. Works on smartphones, tablets and in low-connectivity environments.

Offline Capable Mobile-First
🗃️

Model-Driven Apps

Enterprise-grade office applications with complex data relationships, business rules, calculated fields, and granular role-based security for your operations teams.

Enterprise Grade Dataverse
🌐

Document Management

Native SharePoint document libraries embedded in Power Apps — view, edit and approve files in-context, with full version history, metadata tagging and automated routing to the right stakeholders.

External Users Branded
🔧

PCF Custom Components

Bespoke Power Apps component framework controls that extend native capabilities — custom pickers, calendars, map views and data visualisation components.

Custom UI PCF
🔗

System Integrations

Connect Power Apps to your existing ERP, CAFM, IoT or bespoke systems using custom connectors, creating a single interface without replacing what already works.

ERP CAFM API
📝

Forms & Data Capture

Digital checklists and intelligent data capture forms that feed directly into your Dataverse data model — eliminating paper and double entry permanently.

Digital Forms Compliance
Typical Use Cases

What FM, Construction & Manufacturing businesses build with us

Facilities Management

Operational apps for FM contractors

  • PPM and work order management
  • Digital permit-to-work workflows
  • Field and site digital workflows
  • Asset register and compliance tracking
  • SLA monitoring dashboards
  • Subcontractor management portal
Construction

Site and office construction tools

  • Site mobilisation workflows
  • Digital snagging and defects
  • Field and H&S inspection capture
  • Subcontractor onboarding portal
  • Variation and instruction register
  • Programme dashboards
Manufacturing

Shop floor to boardroom visibility

  • OEE and downtime data dashboards
  • Quality non-conformance workflows
  • Digital shift handover tools
  • Maintenance request and scheduling
  • Supplier compliance tracking
  • ISO audit-ready reporting
Our Approach

Built governance-first, not added as an afterthought

Too many Power Apps projects are built quickly and then become unmaintainable within a year. We design every app with a proper Dataverse data model, solution architecture and ALM pipeline from day one.

  • Proper Dataverse schema design before any screens are built
  • Dev, Test and Production environment strategy as standard
  • Full technical documentation delivered on handover
  • User training included in every engagement
  • 60-day support post go-live included with every project
Discuss Your Requirement →
01

Structured Data Model

We map your workflows, agree your data model and validate the approach before build begins.

02

UX and Design

UX wireframes and Dataverse schema reviewed and signed off by your team.

03

Structured handover with full documentation

Two-week sprint cycles with regular demos. Your feedback shapes every iteration.

04

Governance-ready from day one, 30-day hypercare support

Governed release, user training, full documentation and 90-day hypercare support.

Common Questions

Questions answered

Can't find what you're looking for? Contact us and we'll answer within one business day.

How long does a Power Apps project typically take?

+

A scoped canvas app for a specific workflow typically takes 4–8 weeks. Complex model-driven applications with integrations take 10–16 weeks. We provide a detailed project plan after discovery so there are no surprises on timeline.

Do we need dataverse or can we use SharePoint

+

For simple apps and forms, SharePoint lists can work. For anything requiring complex relationships, business rules, security roles or large data volumes, Dataverse is the right choice. We advise on the appropriate data layer during discovery.

Will our teamn be able to maintain the app after handover?

+

Yes — we deliver full documentation and training as standard. We also offer extended support plans to keep all apps upto-date and constantly monitor for peace of mind

What Power Apps licences do we need?

+

Most apps require Microsoft Power Apps Premium onto of Microsoft Business licences, however smaller apps can be built using Microsoft business licences.

Power Apps Development

Tell us what you need to build

Book a free 30-minute discovery call. We will scope your requirement, advise on the right approach and give you a clear picture of timeline and investment.

Free 30-min discovery call No obligation Response within 1 business day