Custom Power Apps for operational businesses
We build bespoke Canvas and Model-Driven applications designed around how your people actually work, not how generic software thinks they should. Every custom build is matched to your real operational workflows.
Canvas Apps for Field and Mobile
Offline-capable mobile applications for field engineers, site managers and operatives. Works on smartphones, tablets and in low-connectivity environments.
Model-Driven Apps
Enterprise-grade office applications with complex data relationships, business rules, calculated fields, and granular role-based security for your operations teams. Model-driven is our default for office-based workflows.
Document Management
Native SharePoint document libraries embedded in the app. View, edit and approve files in-context, with full version history, metadata tagging and automated routing to the right stakeholders.
PCF Custom Components
Bespoke component framework controls that extend native capabilities, including custom pickers, calendars, map views and data visualisation components.
System Integrations
Connect your apps to existing ERP, CAFM, IoT or bespoke systems using custom connectors, creating a single interface without replacing what already works.
Forms and Data Capture
Digital checklists and intelligent data capture forms that feed directly into your Dataverse data model, eliminating paper and double entry permanently.
Power Apps for field operatives, designed around the job
Most off-the-shelf field software is built for a generic process. Real site work is messier than that. Our builds for field operatives are designed around what your engineers, supervisors and site managers actually do, not what a generic template assumes. Offline capture, photo evidence, signatures, asset lookups, all working on a rugged tablet without signal.
Behind the scenes, every app is governance-ready: proper Dataverse schema, role-based security, ALM pipeline and full documentation on handover. For the canonical Microsoft reference, see the Microsoft Power Apps documentation on Microsoft Learn.
What FM, Construction and Manufacturing businesses build with our Power Apps consultancy
Operational apps for FM contractors
- PPM and work order management
- Digital permit-to-work workflows
- Mobile tools for field operatives on site
- Asset register and compliance tracking
- SLA monitoring dashboards
- Subcontractor management portal
Site and office construction tools
- Site mobilisation workflows
- Digital snagging and defects
- Field and H&S inspection capture
- Subcontractor onboarding portal
- Variation and instruction register
- Programme dashboards
Shop floor to boardroom visibility
- OEE and downtime data dashboards
- Quality non-conformance workflows
- Digital shift handover tools
- Maintenance request and scheduling
- Supplier compliance tracking
- ISO audit-ready reporting
Power Apps consultancy that builds governance-first, not as an afterthought
Too many Power Apps projects are built quickly and then become unmaintainable within a year. As a UK Power Apps consultancy, we design every app with a proper Dataverse data model, solution architecture and ALM pipeline from day one.
- Proper Dataverse schema design before any screens are built
- Dev, Test and Production environment strategy as standard
- Full technical documentation delivered on handover
- User training included in every engagement
- 60-day support post go-live included with every project
Structured Data Model
We map your workflows, agree your data model and validate the approach before build begins.
UX and Design
UX wireframes and Dataverse schema reviewed and signed off by your team.
Structured handover with full documentation
Two-week sprint cycles with regular demos. Your feedback shapes every iteration.
Governance-ready from day one, 30-day hypercare support
Governed release, user training, full documentation and 90-day hypercare support.
Power Apps consultancy questions answered
Can't find what you're looking for? Contact us and we'll answer within one business day.
How long does a Power Apps project typically take?
+A scoped canvas app for a specific workflow typically takes 4 to 8 weeks. Complex model-driven Power Apps with integrations take 10 to 16 weeks. We provide a detailed project plan after discovery so there are no surprises on timeline.
Do we need Dataverse or can we use SharePoint?
+For simple apps and forms, SharePoint lists can work. For anything requiring complex relationships, business rules, security roles or large data volumes, Dataverse is the right choice. We advise on the appropriate data layer during discovery.
Will our team be able to maintain the app after handover?
+Yes. We deliver full documentation and training as standard. We also offer extended support plans to keep all apps up to date and constantly monitored for peace of mind.
What Power Apps licences do we need?
+Most custom Power Apps require Microsoft Power Apps Premium on top of Microsoft Business licences. Smaller Power Apps can be built using standard Microsoft Business licences.
Tell us what you need to build
Book a free 30-minute discovery call. We will scope your requirement, advise on the right approach and give you a clear picture of timeline and investment.